This project saw our team undertake a range of mechanical, electrical and hydraulics upgrades at the Australian Defence Force’s Keswick Barracks.
The project was carried out over a two-month period within the operational defence base.
Works took place in offices and accommodation areas, as well as the building’s canteen, medical centre and pharmaceutical store.