The scope of this project was to provide a like-for-like replacement of an existing substation, compliant with Manual of Infrastructure Engineering (MIEE) specifications.

The substation consists of the following key elements:

  • A new elevated transportable switchroom building housing
  • 33kV fixed switchgear
  • 11kV withdrawable switchgear
  • Redundant battery charger and battery system
  • Protection and control panels, low voltage distribution boards, fire alarm system and telemetry system
  • Spatial provisions for future PCMS equipment

The existing outdoor switchyard, switchroom building and existing 33kV, 11kV and 0.4kV incoming and outgoing supplies were demolished, in a process subject to strict environmental requirements.
Cabling was installed to interface with existing incoming and outgoing overhead distribution lines, and secured with new substation compound fencing, lighting and access roads.

Sector Defence
Client Department of Defence
Location Woomera SA
Value $4.2M
Contract Construct Only
Grey map of Australia indicating approximate location of project.